
New TopShim run:

version = topshim 2.0.0
date = 2025-02-19
time = 05:27:05.190
command = topshim  z6off

FINE SHIMMING

Parameters:

probe = Z114229_0012
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.463

shim changes: 
Z	-1
Z2	-30
Z3	-31
Z4	-308
Z5	+96

duration = 3 min 56 sec
completed successfully
finished Wed Feb 19 05:30:59 2025


========================================================================
